Pillars
Completed projects
Under implementation projects
Number
Cost (Rs. Cr)
Number
Cost (Rs. Cr)
Coastal Shipping and IWT
25
1178.5
17
1167.7
Coastal Community Development
19
1912.6
28
3008.4
Port Modernization
18
870.2
6
160.8
Port Connectivity
17
1413.2
3
201.3
Grand Total
79
5374.5
54
4538.2
One of the objectives of Sagarmala programme is better port connectivity, efficient cargo movement between ports and their respective hinterland to minimize overall logistics cost. Sagarmala programme has a dedicated pillar of port connectivity which focuses on the last mile and immediate hinterland connectivity of the ports via road, rail and inland waterways. Further, Department for Promotion of Industry and Internal Trade (DPIIT) has undertaken a comprehensive assessment of port connectivity and prepared a Comprehensive Port Connectivity Plan (CPCP) in 2022 by reviewing connectivity of the operational ports and identified the ports which needed improvement of road and/ or rail connectivity with nearby economic hubs.
Subsequently, MoPSW in consultation with Ministry of Road, Transport and Highways and Ministry of Railways has identified a total of 294 rail and road connectivity projects, out of which, 84 projects (63 Rail and 21 Road) have been completed, 66 projects (27 Rail and 39 Road) are under implementation, and a total of 144 projects (42 Rail and 102 Road) are under planning stage. The connectivity projects within the port limits are taken up by the Port Authorities and beyond the port limits are taken up by Ministries like MoR, MoRTH or State Governments.
Sl. N
Name of Proj ect
Implementing Agency
Status
District
Project cos
MoPS
1
Construction of coastal Berth at Visakhapatn
Visakhapatna m Port Authorit y (VPA)
Completed
Visakhapatna m
43
30
2
Construction of grade separat or from H-7 are a to Port conne ctivity Road by passing Conve nt Junction - Vi sakhapatnam
National Highw ays Authority o f India (NHAI)
Completed
Visakhapatna m
60
23.17
3
2 to 4 laning of port road conn ectivity to NH -
NHAI
Completed
Visakhapatna m
77.00
20.00
4
Centre of Excel lence in Mariti me and Shipbu ilding -CEMS - AP-18 out of 2 4 Labs in Andh
Indian Register of Shipping (I RS)
Completed
Visakhapatna m
574.00
36.76
5
Coastal District s Skill Develop ment Program
Ministry of Rur al Developmen t
Completed
Multiple district s
0.14
0.14
6
Development o f Fishing Harbo ur in Juvvaladi nne in SPSR N ellore District, Andhra Prades
Andhra Prades h Maritime Infr astructure Dev elopment Corp oration (APMID CL)
Completed
Nellore
288
69.14
7
Improvement o f Kakinada Anc horage Ports in frastructure in East Godavari district, Andhra
Andhra Prades h Maritime Boa rd
Completed
Kakinada
85.83
36.67
8
Modernisation of Visakhapatn am Fishing Har
VPA
Under Implem entation
Visakhapatna m
178.51
50.00
9
Coastal District s Skill Develop ment Program
Ministry of Rur al Developmen t
Under Implem entation
Multiple district s
5.98
5.98
As regard to inland waterway connectivity projects, details of projects completed by Inland Waterways Authority of India (IWAI) on National Waterways (NW) are as under:
o.
t
W sha re
am port
Port
5 -Phase II
ra Pradesh
- Phase I -And
(DDU-GKY)
h
Pradesh
bour
- Phase 2 -And
(DDU-GKY)
3 Multi Modal Terminals (MMTs) and 01 intermodal terminal on NW 1
(Rs. Cr)
(Rs. Cr)
hra Pradesh
hra Pradesh
1 MMT and 3 IWT terminals on NW 2
9 IWT terminals on NW 3;
02 Roll-on/Roll-off (Ro-Ro) terminals in Ernakulam
Sagarmala scheme is a central sector scheme of Ministry of Ports, Shipping and Waterways (MoPSW) with the target to promote port-led development in the country. Under this scheme, MoPSW provides financial assistance for the projects under 5 pillars namely, port modernization, port connectivity, port-led industrialization, coastal community development, and coastal shipping & inland water transport. The pillar wise progress of the projects funded under Sagarmala scheme is available at Annexure-I.
Annexure I
01 Ro-Ro terminal on NW 4
Details of Completed and under Implementation projects pillar wise under Sagarmala Scheme:
The MoPSW has sanctioned financial assistance of Rs. 272 crore to 9 projects worth
Rs. 1,286 crore under Sagarmala scheme in the state of Andhra Pradesh and the details of these projects are available at Annexure-II. These projects are related to Ro-Pax and passenger jetties, fishing harbours, port modernization and skill development.
Government has taken several measures to enhance port capacity, improve operational efficiency, and reduce vessel turnaround time at major ports. Infrastructure development and capacity augmentation is a continuous process and includes construction of new berths and terminals, mechanization, modernization and optimization of existing berths and terminals, capital dredging to deepen drafts for accommodating larger vessels, development of road and rail connectivity, and creation of supporting infrastructure such as parking plazas. Further, port processes have been streamlined with the implementation of One Nation One Port Process (ONOP) to improve operational efficiency and reduce vessel turnaround time. As a result of these initiatives, the cargo handling capacity of the Major and Other than Major Ports (OTMP) has increased to 2,818 Million Tonnes Per Annum (MTPA) as on March 2026 from ~1,400 MTPA in 2013-14.
List of Sagarmala-funded Projects in Andhra Pradesh:
Disclaimer: Curated by HT Syndication.